Precision Construction Solutions

Comprehensive Field Services

Chemical Service
MYR 180.00

Full-Spectrum Chemical Service (Indoor Split Unit)

Our signature deep-clean service goes beyond surface dusting. We perform a complete teardown of your indoor unit to ensure every internal component is sanitized and restored to peak efficiency.

  • Precision Dismantling: We carefully remove the chassis, drainage tray, and blower wheel to access hidden buildup.

  • Deep Chemical Immersion: Non-corrosive, industrial-grade alkaline cleaners are applied to the cooling coils and components to dissolve stubborn biofilms, mold, and accumulated grime.

  • Component-Level Sanitization: By separating all parts, we eliminate 99.9% of bacteria and odors that standard "over-the-wall" cleaning cannot reach.

  • Optimized Airflow: Our process restores the blower wheel’s aerodynamic balance, significantly increasing airflow and reducing energy consumption.

Maintenance Service
MYR 150.00

Our Driver Replacement Protocol

  1. Fault Diagnosis: We test the DC output of the existing driver to confirm failure versus an LED board fault.

  2. Specification Verification: We identify the correct Class 2 or Non-Class 2 driver based on wattage, power factor, and dimming compatibility (TRIAC, 0-10V, or DALI).

  3. Safe De-installation: Complete isolation of AC power followed by the removal of the defective unit.

  4. Integration: Secure mounting of the new driver and precision terminal connections using heat-rated connectors.

  5. Performance Testing: Post-installation testing to ensure zero flicker and stable current draw.

Plumbing service
MYR 80.00

Scope of Work: Plumbing Inlet Point Addition

This service covers the end-to-end installation of an additional cold or hot water supply point:

  1. Site Assessment: Evaluation of existing pipe diameter and flow rate to ensure the new point does not compromise system-wide pressure.

  2. Line Tapping: Professional "T-junction" integration into the primary or secondary water line.

  3. Concealed or Exposed Piping: Secure mounting of pipework using vibration-resistant clips, with options for wall-chasing (concealed) or neat trunking (exposed).

  4. Control Valve Installation: Fitting of a dedicated quarter-turn isolation valve for easy future maintenance.

  5. Termination: Installation of a threaded adapter or bib tap compatible with standard appliance hoses

Reserve a Consultation Slot

Meet with a project specialist to evaluate requirements, explore feasibility, and establish next steps.

Placeholder

Initiate Your Project Consultation

Submit the form to outline objectives, timelines, and scope so a specialist can formulate a tailored proposal.